YUNXIU / OPERATIONS GUIDE

Planning dispatch waves during promotional peaks

Releasing all peak orders together can block picking, packing and staging. Dispatch waves should reflect accepted commitments and operating constraints, with a separate path for exceptions, not merely customer ranking.

Yunxiu · Operations planning reference · Updated 8 November 2026

Check executability first

Separate incomplete addresses, unresolved stock, batch questions and unmet release conditions. Assess order lines, split-pick proportion and packaging work, not only order counts. Give each wave explicit entry and completion conditions.

  • Keep held orders visible rather than deleting them from performance reports.

Plan around the bottleneck

If packing or checking is constrained, excessive picking creates loose-stock congestion. Coordinate resources across preparation and handover without inventing capacity promises. Carrier windows may guide priority but cannot override required checks or existing commitments silently.

  • Use manageable wave sizes, not the largest possible release.

Control exception re-entry

Move shortages, label issues and packaging problems to a separate list with owner and re-entry criteria. Do not leave exception goods in ordinary staging. Check order version and completed work before re-entry to prevent duplicate picks or cancelled-order dispatch.

  • Keep allocation, owner and batch distinctions across waves.

Measure actual handover

Record release, pick completion, pack completion and carrier handover separately. Packed but uncollected goods have not fulfilled a delivery promise. Review waiting and rework causes after peaks and correct data or confirmation failures instead of only demanding faster work.

  • Escalate infeasible windows early with realistic alternatives.

Example: turn the decision into a record

Eighty full-carton orders and twenty kit-assembly orders are not 100 equivalent units of work. Consider separate waves around accepted carrier windows and checking resources. If kit artwork is unapproved, hold those orders in a visible pending list rather than allowing unfinished work to block normal dispatch staging.

Define wave closure explicitly: all packages handed over or outstanding items transferred to a named follow-up list. Removing exceptions from a work area does not mean they disappeared. Report the completed portion and remaining obligation honestly rather than inflating the wave's completion status.

Before you proceed

  • Release executable orders
  • Match checking and packing capacity
  • Assign exception ownership
  • Measure actual handover