Separate three quantities
Inventory measures goods, operations measure agreed actions and materials measure labels or packaging used. A carton containing several products with two labels each has different carton, unit and sheet counts. State each billing unit and its conversion conditions instead of writing only “labeling fee times quantity.”
- Inventory unit
- Billable-action unit
- Material-use unit
Build evidence by job
Link charges to a task, product, planned amount, actual completion and acceptance. State whether opening packs, removing old labels and repacking are separate or included. Batch- or shipment-based fees need an agreed definition, not arbitrary splitting after the work.
- Charge-to-job mapping
- Included scope
- Batch definition
Account for rework separately
Revisions, defective materials and execution errors can cause repeated work, but charging depends on authorization and responsibility. Retain the original job, reason, instruction and acceptance. Distinguish samples, agreed waste, free rework and chargeable rework.
- Cause and authorization
- Free versus paid rework
- Sample and waste treatment
Preserve disputed differences
Confirm undisputed items and list the disputed units, quantities, rates and missing evidence separately. Do not change inventory to match an invoice or treat payment as proof of quality acceptance. Retain the resolution basis for future quotations.
- Identified disputed lines
- Evidence owner
- Resolution record
Before you proceed
- Keep three quantities distinct
- Agree units and conversions
- Trace charges to jobs
- Authorize rework charges
- Separate billing from acceptance
Related operations
Review the cargo and the work together
Share the product, packaging, batches and quantities, customs status, expected schedule and the special requirements discussed here. Confirm acceptance before arranging delivery.