How should goods be repacked and handed over after inspection?

Inspection can involve opening, examination or sampling, repacking and a new handover. A note saying “inspection complete” cannot explain changed quantities or seals. Agree materials, authorization and hold conditions in advance, so the team does not improvise after opening.

Yunxiu · Operations planning reference · Updated 8 November 2026

Record the original state

Follow the applicable procedure to confirm scope and assisting personnel. Record carton IDs, seals, external packaging and existing exceptions. Agree substitutes for packaging that cannot be reused. Do not expand sampling or open retail packs without permission.

  • Inspection scope
  • Original seals and photographs
  • Restoration conditions

Separate examination, retained samples and repacking

Record opened units, quantities examined, lawfully retained samples and quantities actually repacked. Preserve relevant supporting records. Retained samples are not unexplained warehouse shortages, but differences must not all be dismissed as inspection loss either. Record deviations from the plan for responsible-party confirmation.

  • Examination versus retained samples
  • Repacked quantities
  • Difference evidence

Check packaging against intended use

Replacement closure must protect goods and preserve identifiers; changed carton IDs need links to earlier records. Restored transit packaging may still be unsuitable for the original sales channel. Broken retail seals need review, and sterile, hygienic or special protective packaging cannot be declared restored merely by applying tape.

  • Old-to-new carton mapping
  • Readable identifiers
  • Special-packaging review

Update status without erasing history

Check count, appearance and new seals, listing outstanding packaging, documentary or quality issues. Hand over accepted and unresolved quantities separately with before-and-after records. Repacking completion does not itself establish customs or quality release.

  • Repacking acceptance
  • Outstanding issues
  • Linked historical records

Before you proceed

  • Record the original condition
  • Separate samples from shortages
  • Trace packaging changes
  • Do not improvise special-packaging approval
  • Retain unresolved statuses