Separate planned composition from actual use
A bill of materials states the SKUs and quantity per kit; production records must identify the batches actually used. Do not substitute the planned BOM for consumption records. When a batch changes mid-job, create a traceable cutover, such as a new job batch or package-number range, rather than reconstructing it afterward.
- Kit version and composition
- Actual component batches
- Recorded cutover
Choose achievable traceability
Per-kit records may be appropriate, but verify the system and work process can deliver them. If tracing by job batch, identify all component batches included and recognize the larger possible recall scope. Do not claim item-level tracking when only daily totals exist.
- Kit or job-batch granularity
- Identification method
- Affected scope
Preserve expiry and quality status
Combining products must not erase shorter shelf life or unresolved quality status. Check original identifiers and applicable requirements; an authorized party approves kit labeling and expiry presentation. Pending or questionable goods cannot be treated as accepted because an order is urgent, and substitutions require approval.
- Component status checks
- Approved expiry presentation
- Substitution authorization
Reverse kits with identity intact
Reference the original assembly job and verify component counts, batches, packaging and usability. Do not automatically restore everything to available stock: damage, changed labels or missing links may require review. Account for remaining packaging and unrecoverable quantities as well.
- Original-job link
- Component-state review
- Loss and material records
Before you proceed
- Separate planned and actual composition
- Record batch changes
- Use realistic traceability
- Preserve quality status
- Review every dismantled component