How should obsolete labels and remaining materials be controlled?

A revision change can leave an old roll beside the printer, loose labels at a workstation or partly completed stock. Receiving the new material does not withdraw the old version. First define affected products and the effective cutover; then decide what happens to remaining material and work in progress.

Yunxiu · Operations planning reference · Updated 8 November 2026

Define the affected stock

The change record should identify both revisions, SKUs, batches and effective time. Specify whether completed stock remains valid, requires rework or must wait for a decision. “Use the new version today” is insufficient for work spanning shifts or jobs issued but not started.

  • Revision mapping
  • Completed and unfinished quantities
  • Effective cutover

Withdraw files and clear the line

Stop issuing the obsolete version. Check workstations, printers, temporary storage and rework areas, collecting and marking material as unavailable. Disable electronic templates as well. Record areas inspected, materials found and the reviewer; renaming a file while leaving it available to operators is not effective withdrawal.

  • Workstation and printer checks
  • Template withdrawal
  • Line-clearance review

Reconcile material quantities

Record opening stock, issues, additional supplies, finished-unit use, samples, damage and returns. If roll counts are estimated, state the method and uncertainty. Investigate sample and rework records before assigning discrepancies to normal waste.

  • Material balance
  • Separate sample and rework use
  • Explained discrepancies

Authorize the final disposition

Remaining material may be held, returned or disposed of under an authorized instruction. Protect branded or regulated identifiers from uncontrolled release. If destruction is authorized, retain appropriate quantity and execution evidence. Staff should not permanently dispose of materials merely to clear space.

  • Disposition authorization
  • Handover or execution evidence
  • Segregated unresolved stock

Before you proceed

  • Fix the obsolete-version scope
  • Clear physical and electronic materials
  • Separate samples and damage
  • Investigate discrepancies
  • Authorize disposition