Assess stability rather than appearance
Record damage position, load lean, loose wrapping, overhang and usable fork access. Photographs should connect the damaged area to the whole load. Inspect safely without reaching under cargo or lifting an unstable unit merely to see its underside. Stop routine handling when safe movement is uncertain.
- Record pallet and visible cargo damage separately.
- Do not infer capacity from a neighbouring pallet.
Agree the replacement scope
Repalletising may involve unwrapping, moving cartons and restrapping. Obtain approval and any restrictions on tilting or handling. Agree materials, labour and retention of the damaged pallet before work, particularly if the original packaging may support a claim.
- Label and retain the old pallet if required.
- Seek another arrangement for cargo that cannot be safely transferred.
Maintain count and lot identity
Record quantities as goods move to the new pallet, separating mixed SKUs and lots. Link the new identifier to the old one. If carton damage or a dropped item is discovered, open a separate exception rather than treating repalletising as resolution of every issue. Check rebuilt load stability.
- Avoid dismantling several units without source control.
- Keep the quantity and packaging mapping.
Reflect limitations in receipt and stock status
State the original condition, action taken and inspection scope. External inspection does not prove all products are sound. Goods requiring quality review should remain pending, and any remaining handling restrictions must follow released stock. Resolve charges against actual work and agreed terms, not assumptions about a signature.
- Close packaging and product-quality issues separately.
- Link the replacement record to the transport document.
Before you proceed
- Support risk assessed
- Replacement authorised
- Counts and identifiers linked
- Receipt limitations recorded
Related operations
Review the cargo and the work together
Share the product, packaging, batches and quantities, customs status, expected schedule and the special requirements discussed here. Confirm acceptance before arranging delivery.