Identify the extent and immediate risk
Record whether moisture affects bottom layers, one side or the whole load. Describe softening, deformation, leakage and other visible conditions separately. Avoid further stacking on weakened cartons. Suspected leakage or unknown substances require the site's exception process, not improvised opening or contact by receiving staff.
- Photograph both pallet position and detail.
- Identify affected and apparently unaffected cartons separately.
Separate handling from quality assessment
Warehouse staff may assess visible packaging, but product fitness requires the authorised party's judgement against product specifications. A dry surface does not establish sound contents. Agree opening, sampling, identification and resealing before an inspection that could otherwise create new damage or lot confusion.
- Describe checks actually performed.
- Retain product storage instructions for review.
Preserve identity during repacking
Before approved carton replacement, capture original labels, carton numbers, lot and quantity links. Check replacement packaging against handling and transport needs. Do not lose controlled or traceability information with the old carton. An unreadable label requires supporting identification, not a copied label from a neighbouring box.
- Map original cartons to replacements.
- Agree retention of damaged packaging where investigation needs it.
Make release a separate decision
Distinguish stock awaiting quality review, stock approved for repacking and stock cleared for use. Completing the physical job should not automatically make inventory available. Record who approved release, the exact cartons covered and remaining restrictions. Handle claims and additional charges separately from quality decisions.
For example, cartons that are dry on top but softened underneath should remain distinguishable from units with no visible moisture, even if they share a pallet.
- Release only the specifically approved goods.
- State what internal condition remains uninspected.
Before you proceed
- Moisture extent documented
- Quality decision separated
- Old and new identities linked
- Stock release authorised
Related operations
Review the cargo and the work together
Share the product, packaging, batches and quantities, customs status, expected schedule and the special requirements discussed here. Confirm acceptance before arranging delivery.