Describe the packaging composition
Pallets, crates, bracing and loose dunnage may use different materials or sources. Provide a breakdown, photographs and relevant records rather than just wood packaging in the booking. Requirements need assessment against the actual material and journey. Do not assume identical treatment for solid and processed materials or declare an exemption without verification.
- Include easily overlooked dunnage.
- Use evidence for this shipment, not a previous one.
Record marks without certifying them
Photograph content, location and legibility, and show the packaging to which the mark belongs. Flag unclear or conflicting information. An apparently complete mark is not warehouse proof that treatment occurred correctly. The party responsible for the applicable procedure must resolve compliance questions.
- Never recreate or copy a treatment mark.
- State the limits of the visual check.
Control unnecessary handling of exceptions
Report visible signs of pests, unusual debris or other concerns through the site's process. Staff should not improvise spraying, dismantling or disposal. Moving or replacing packaging may affect investigation or required procedures, so obtain a clear authorised arrangement while maintaining suitable cargo protection.
- An observation is not a specialist diagnosis.
- Keep affected packaging identifiable.
Link replacement to the record
Where replacement is authorised, record old and new packaging, quantities and identifiers, and establish which documents require updating. Retention or disposal must follow applicable requirements and responsible instructions. Replacement does not automatically close the earlier exception.
A clearly marked pallet and an unmarked loose brace in the same load should be recorded separately rather than treating one visible mark as evidence for everything.
- Retain approval and execution evidence.
- Separate charges from compliance closure.
Before you proceed
- Materials described
- Marks linked to actual cargo
- Exceptions not improvised away
- Replacement traceable
Related operations
Review the cargo and the work together
Share the product, packaging, batches and quantities, customs status, expected schedule and the special requirements discussed here. Confirm acceptance before arranging delivery.